Case Study 8 - Emirates Stadium. Arsenal FC


The Brief:
To design and manufacture two generator housings for the Emirates Stadium, home of Arsenal FC in London. The noise level limitations were set at 85 db at 1m.
Summary:
The two units were wholly manufactured, painted and fully fitted at PEC’s factory in Bristol.
The project was completed within deadline, within budget, tested and approved prior to despatch as having achieved all output and noise level requirements as outlined within the brief.
Date:
2007
Similar Projects:
— Heathrow Terminal 5 Generator Housings (Swiss Air)